Current Units |
Proposed New Units |
|
|
|
|
|
| AQF |
Code |
Title |
Code |
Title |
|
| 1. General Fields of Competence Applicable to All Sectors |
|
|
|
|
|
|
|
|
|
| 1.1 Risk Management - RIIRIS |
|
|
|
| |
|
|
|
|
|
| 1 |
RIIG004A |
Conduct local risk control |
RIIRIS201 |
Conduct local risk control |
|
| 2 |
MNCC1006A |
Conduct local risk assessment |
|
| 2 |
MNMC205A |
Conduct local risk assessment |
|
| 2 |
MNQGEN200A |
Conduct local risk control |
|
| 3 |
BCCCM3005A |
Carry out site based risk control procedures |
Note: |
Civil recommend BCCCM3005A be considered as AQF3 unit |
|
|
|
|
|
|
|
| 3 |
MNCG1001A |
Apply risk management processes |
RIIRIS301 |
Apply risk management processes |
|
| 3 |
MNMG325A |
Apply risk management processes |
|
| 3 |
MNQGEN300A |
Apply risk management processes |
Note: |
Drilling question if there is a suitable BSB unit |
|
|
|
|
|
|
|
| 4 |
MNQGEN400A |
Apply site risk management system |
|
|
|
|
|
|
|
|
|
| 4 |
MNCG1002A |
Implement and apply the risk management processes |
RIIRIS402 |
Carry out risk management processes |
|
| 5 |
MNMMMG516A |
Facilitate the risk management process |
Note: |
Need to determine if RIIRIS402 is necessary |
|
|
|
|
|
|
|
| 5 |
MNCG1103A |
Implement and maintain management systems to control risk |
RIIRIS501 |
Implement and maintain management systems to control risk |
|
| 5 |
MNQGEN500A |
Implement and maintain management plans to control risk |
|
| 5 |
DRTOG53B |
Implement and maintain occupational health and safety/environmental site risk management processes |
|
|
|
|
|
|
|
| 6 |
MNCG1003 |
Establish the risk management system |
RIIRIS601 |
Establish the risk management system |
|
| 6 |
MNMMSM617A |
Establish the risk management system |
|
| 6 |
MNQGEN600A |
Establish and maintain the risk management system |
|
|
|
|
|
|
|
| 1.2 Governance & Compliance - RIIGOV |
|
|
|
|
|
|
|
|
|
| 4 |
BSBSBM401A |
Establish business and legal requirements |
RIIGOV401 |
Establish, monitor and report on compliance systems. |
|
| 4 |
MNQGEN401A |
Apply site statutory compliance management plan |
|
| 4 |
MNMMSU401A |
Apply, monitor, rectify and report statutory/legal compliance |
|
|
|
| 5 |
MNMMMG501A |
Implement and maintain statutory/legal compliance systems |
RIIGOV501 |
Identify, implement and maintain legal compliance requirements |
|
| 5 |
DRTOG52B |
Implement and maintain statutory/legal compliance system |
|
|
|
| 6 |
MNCG1102A |
Establish the statutory compliance management system |
RIIGOV601 |
Establish, maintain and develop a statutory compliance management system |
|
| 6 |
MNMMSM616A |
Establish the statutory compliance management system |
|
| 6 |
MNQGEN601A |
Establish and maintain the statutory compliance management system |
|
|
|
| 1.3 Occupational Health & Safety - RIIOHS |
|
|
|
|
|
| 1 |
RIIG001A |
Work safely and follow OH&S policies and procedures |
RIIOHS201 |
Work safely and follow OH&S policies and procedues |
|
| 2 |
BCCCM1001B |
Follow OH&S policies and procedures |
|
| 2 |
DRTNHB01A |
Follow workplace health, safety and environment procedures |
|
| 2 |
DRTNHB02A |
Follow underground health and safety procedures |
|
| 2 |
MNCC1001A |
Work safely |
|
| 2 |
MNMC201A |
Work safely |
|
| 2 |
MNQGEN210A |
Work safely |
|
| 2 |
DRTOG01B |
Assist with the health and safety of the working environment |
|
| 2 |
DRTOG08B |
Contribute to the health and safety of the working environment |
|
|
|
| 2 |
MNCG1012A |
Maintain bathroom hygiene |
Note: |
NSW Coal recommend title change to ''Maintan amenities' |
|
|
|
| 2 |
BCCCM2009B |
Work in confined spaces |
RIIOHS203 |
Work in confined spaces |
|
| 2 |
PMAPER205B |
Enter confined space |
Note: |
NSW Coal recommend 'use national standard' |
|
|
|
| 2 |
MNMG237A |
Work safely at heights |
Note: |
NSW Coal recommend 'use national standard' |
|
|
|
| 2 |
BCCCM2013B |
Control traffic with a stop-slow bat |
Note: |
NSW Coal recommend 'use national standard' |
|
|
|
|
|
|
|
| 3 |
BCCCM3003B |
Implement traffic management plan |
|
|
|
|
|
|
|
|
|
| 3 |
PMAPER300C |
Issue work permits |
|
|
|
|
|
|
|
|
|
| 3 |
PMLOHS301B |
Work safely with instruments that emit ionizing radiation |
|
|
|
|
|
|
|
|
|
| 3 |
PUAFIR307A |
Monitor hazardous atmospheres |
Note: |
NSW Coal recommend 'use national standard' |
|
|
|
|
|
|
|
| 3 |
MNCG1008A |
Conduct safety and health investigations |
RIIOHS301 |
Conduct safety and health investigation |
|
| 3 |
MNMG326A |
Conduct safety and health investigations |
|
| 3 |
MNQGEN310A |
Conduct safety and health investigations |
|
|
|
|
|
|
|
| 3 |
DRTOG13B |
Apply occupational health and safety in the workplace |
BSBCMN311A |
Maintain workplace safety |
|
| 3 |
PRSIR39A |
Manage occupational health and safety in the workplace |
|
| |
|
|
|
|
|
| 4 |
BSBCMN411A |
Monitor a safe workplace |
BSBCMN411A |
Monitor a safe workplace |
|
| 4 |
MNCG1105A |
Apply the mine occupational health and safety management plan |
|
| 4 |
MNCG1007A |
Implement and monitor health and hygiene management systems |
|
| 4 |
MNCO1042A |
Examine and maintain mine safety |
Note: |
QLD Coal recommend MNCO1042A not change, but NSW Coal |
|
| 4 |
DRTOG25B |
Maintain standard procedures and safe working practices |
|
want to check the scope of the application of the unit |
|
|
|
|
|
|
|
| 4 |
MNMMSU411A |
Supervise work in confined space |
|
|
|
|
|
|
|
|
|
| 5 |
BSBMGT505A |
Ensure a safe workplace |
BSBMGT505A |
Ensure a safe workplace |
|
|
|
|
|
|
|
| 5 |
MNCG1107A |
Establish and maintain the mine occupational health and safety management system |
RIIOHS601 |
Establish and maintain the occupational health and safety management system |
|
| 6 |
MNMMSM624A |
Establish and manage the mine occupational health and safety management system |
|
| 6 |
MNQGEN610A |
Establish and maintain the mine occupational health and safety management system |
Note: |
Driiling recommend we look at a BSB unit at this level. |
|
| |
|
|
Note: |
NSW Coal recommend MNCG1006A requirements be included in a rationalised unit at this level |
|
| 6 |
MNCG1006A |
Incorporate health and hygiene factors into mine management |
|
|
|
|
|
|
|
|
| 1.4 Environment - RIIENV |
|
|
|
|
|
|
|
|
|
| 2 |
BSBCMN215A |
Participate in environmental work practices |
|
|
|
|
|
|
|
|
|
| 2 |
MNMOR210A |
Identify and assess environmental and heritage concerns |
Note: |
Civil recommend possible merging with BSBCMN215A |
|
|
|
|
|
|
|
| 3 |
BSBCMN313A |
Maintain environmental procedures |
Note: |
metalliferous T'vle recommend merging with BSBCMN215A |
|
|
|
|
|
|
|
| 2 |
MNMG244A |
Supress airborne contaminants |
|
|
|
|
|
|
|
|
|
| 3 |
MNCU1026A |
Conduct environmental monitoring |
Note: |
NSW Coal recommend change to 'atmospheric monitoring' |
|
|
|
|
|
|
|
| 4 |
BSBCMN413A |
Implement and monitor environmental policies |
|
|
|
| 4 |
PMASUP420A |
Minimise environmental impact of process |
BSBCMN413A |
Implement and monitor environmental policies |
|
| 4 |
MNCO1045A |
Apply and monitor environmental management policies, plans and procedures |
|
|
|
|
|
|
|
|
|
| 4 |
MNQGEN404A |
Supervise dust and noise control |
Note: |
NSW Coal recommend check of MNCO1045A |
|
|
|
|
|
|
|
| 5 |
MNMMEN502A |
Undertake process or project environmental impact assessment |
|
|
|
|
|
|
|
|
|
| 5 |
MNMMEN503A |
Implement mining operations environmental system |
RIIENV501 |
Implementand and maintain environmental management plan |
|
| 5 |
MNMMEN505A |
Monitor and correct activities having impact on the environment |
|
| 5 |
MNMMEN506A |
Review environmental management system performance |
|
| 5 |
RIICC543A |
Implement & maintain environmental management plan |
|
| 5 |
BSBMGT507A |
Manage environmental performance |
|
|
|
|
|
|
|
| 5 |
MNMMEN501A |
Develop site environmental policy |
RIIENV601 |
Establish and maintain the environmental management system |
|
| 6 |
MNCG1101A |
Establish and maintain the environmental management system |
|
| 6 |
MNMMSM601A |
Establish and maintain the environmental management system |
|
| 6 |
MNQGEN620A |
Establish and maintain the environmental management system |
|
| 6 |
BSBMGT610A |
Manage environmental management systems |
|
| |
|
|
|
|
|
| 1.5 Quality - RIIQUA |
|
|
|
|
|
|
|
|
|
| 1 |
RIIG003A |
Contribute to quality work outcomes |
RIIQUA201 |
Maintain and monitor site quality standards |
|
| 2 |
MNCC1005A |
Comply with site work systems/procedures |
|
| 2 |
MNMC203A |
Contribute to quality work outcomes |
|
| 2 |
MNQGEN230A |
Contribute to site quality outcomes |
|
| 2 |
PMCSUP290A |
Monitor and maintain product quality |
|
| 3 |
DRTOGON18B |
Maintain services and operations to meet quality standards |
Note: |
NSW Coal recommend review with 1.1 and 1.3 units |
|
|
|
|
|
|
|
| 4 |
MNCG1113A |
Apply quality management system |
RIIQUA401 |
Apply a quality management system on site |
|
| 4 |
MNQGEN430A |
Apply site quality plan |
|
|
|
|
|
|
|
| 5 |
RIICC544A |
Implement & maintain quality management plan |
RIIQUA501 |
Implement, monitor and develop quality management plans |
|
| 5 |
PRSIR31A |
Undertake process improvement to reduce costs and improve quality service |
|
|
|
|
|
|
|
| 6 |
MNCG1111A |
Establish and maintain the quality system |
RIIQUA601 |
Establish and maintain a quality system |
|
| 6 |
MNQGEN630A |
Establish and maintain the quality system |
|
| |
|
|
|
|
|
| 1.6 Communication - RIICOM |
|
|
|
|
|
|
|
|
|
| 1 |
RIIG002A |
Communicate in the workplace |
RIICOM201 |
Communicate in the workplace |
|
| 2 |
BCCCM1002B |
Conduct workplace communication |
|
| 2 |
MNCC1007A |
Communicate in the workplace |
|
| 2 |
MNMC202A |
Communicate in the workplace |
|
| 2 |
MNQGEN240A |
Communicate in the workplace |
|
| 2 |
DRTOG33B |
Maintain drilling rig communication systems |
|
| 2 |
PUAOPE002A |
Operate communications systems and equipment |
|
| 3 |
MNMSM315A |
Apply mine communications systems |
|
|
|
|
|
|
|
| 3 |
MNCG1009A |
Communicate information |
RIICOM301 |
Communicate information |
|
| 3 |
MNMG327A |
Communicate information |
|
| 3 |
MNQGEN340A |
Communicate information |
|
| |
|
|
|
|
|
| 1.7 Leadership & Teamwork |
|
|
|
|
|
|
|
|
|
| 2 |
DRTNHB03A |
Work effectively in the drilling industry |
BSBCMN204B |
Work effectively with others |
|
| 2 |
DRTNHB04A |
Work in a drilling team |
|
| 2 |
DRTOG03B |
Assist in establishing and maintaining effective working relationships |
|
| 2 |
DRTOG10B |
Establish and maintain effective working relationships |
|
|
|
|
|
|
|
| 3 |
BSBFLM302A |
Support leadership in the workplace |
Note: |
Recommend deletion as is no longer exists in new BSB07 |
|
|
|
|
|
|
|
| 3 |
BSBFLM304A |
Participate in work teams |
Note: |
Recommend deletion as is no longer exists in new BSB07 |
|
|
|
|
|
|
|
| 3 |
BSBFLM312A |
Contribute to team effectiveness |
Note: |
Recommend deletion as is no longer exists in new BSB07 |
|
|
|
|
|
|
|
| 3 |
BSBFLM303A |
Contribute to effective workplace relationships |
Note: |
Recommend deletion as is no longer exists in new BSB07 |
|
|
|
|
|
|
|
| 3 |
DRTOG15B |
Create, maintain and enhance productive working relationships |
Note: |
Believe this unit is redundant |
|
|
|
|
|
|
|
| 3 |
DRTOG35B |
Maintain man management systems |
BSBPM405B |
Apply human resource management approaches |
|
| 4 |
BSBPM405A |
Apply human resource management approaches |
|
|
|
|
|
|
|
| 4 |
BSBFLM403B |
Implement effective workplace relationships |
Note: |
Believe this unit is redundant |
|
|
|
|
|
|
|
| 4 |
BSBFLM402A |
Show leadership in the workplace |
BSBFLM402C |
Show leadership in the workplace |
|
|
|
|
|
|
|
| 4 |
BSBFLM404A |
Lead work teamsC |
BSBFLM412C |
Promote team effectiveness. |
|
| 4 |
DRTOG37B |
Participate in, lead and facilitate work team |
|
| 4 |
BSBSBM407A |
Manage a small team |
|
| 4 |
BSBFLM412A |
Promote team effectiveness |
|
|
|
|
|
|
|
| 5 |
BSBFLM502A |
Provide leadership in the workplace |
Note: |
Recommend deletion as is no longer exists in new BSB07 |
|
|
|
|
|
|
|
| 5 |
BSBFLM512A |
Ensure team effectiveness |
BSBFLM512B |
Ensure team effectiveness |
|
| 5 |
BSBFLM504A |
Facilitate work teams |
|
| 5 |
DRTNHB46A |
Maintain effective team/crew operations |
|
| 5 |
PRDSIS25A |
Lead and supervise teams |
|
| 5 |
BSBFLM503A |
Establish effective workplace relationships |
|
|
|
|
|
|
|
| 5 |
DRTNHB51A |
Manage human resources |
RIIHRM501 |
Manage human resources |
|
|
|
|
|
|
|
| 5 |
BSBMGT502A |
Manage people performance |
BSBMGT502B |
Mange people performance |
|
|
|
|
|
|
|
| 5 |
BSBHR504A |
Manage industrial relations policies and procedures |
|
|
|
|
|
|
|
|
|
| 5 |
BSBHR506A |
Manage recruitment selection and induction processes |
|
|
|
|
|
|
|
|
|
| 5 |
BSBMGT506A |
Recruit, select and induct staff |
|
|
|
|
|
|
|
|
|
| 5 |
BSBFLM511B |
Develop a workplace learning environment |
|
|
|
|
|
|
|
|
|
| 6 |
BSBMGT605A |
Provide leadership across the organisation |
|
|
|
|
|
|
|
|
|
| 6 |
MNMMSM607A |
Manage group process |
|
|
|
|
|
|
|
|
|
| 1.8 Business Effectiveness |
|
|
|
|
|
|
|
|
|
| 1 |
RIIG2001A |
Plan and organise work |
RIIBEF201A |
Plan and organise work |
|
| 2 |
BCCCM1003B |
Plan and organise work |
|
| 2 |
MNMG203A |
Plan and organise work |
|
|
|
|
|
|
|
| 2 |
MNMG224A |
Identify and rectify mine operating problems |
|
|
|
|
|
|
|
|
|
| 3 |
BSBCMN312A |
Support innovation and change |
|
|
|
|
|
|
|
|
|
| 3 |
BSBFLM305A |
Support operational plan |
Note: |
Recommend deletion as is no longer exists in new BSB07 |
|
|
|
|
|
|
|
| 3 |
DRTNHB21A |
Run on-site operations |
|
|
|
|
|
|
|
|
|
| 3 |
PMLORG300A |
Follow established work plan |
|
|
|
|
|
|
|
|
|
| 3 |
MNMG351A |
Monitor mine production activities |
|
|
|
|
|
|
|
|
|
| 4 |
BSBSBM404A |
Undertake business planning |
|
|
|
|
|
|
|
|
|
| 4 |
BSBSBM405A |
Monitor and manage business operations |
|
|
|
|
|
|
|
|
|
| 4 |
DRTNHB41A |
Manage non-routine, complex technical situations |
|
|
|
|
|
|
|
|
|
| 4 |
BSBFLM405B |
Implement operational plan |
BSBFLM405C |
Implement operational plan |
|
|
|
|
|
|
|
| 4 |
BSBFLM409A |
Implement continuous improvement |
|
|
|
|
|
|
|
|
|
| 4 |
BSBCMN402A |
Develop work priorities |
|
|
|
|
|
|
|
|
|
| 4 |
BSBCMN412A |
Promote innovation and change |
|
|
|
|
|
|
|
|
|
| 4 |
BSBSBM403A |
Promote the business |
|
|
|
|
|
|
|
|
|
| 5 |
BSBFLM501A |
Manage personal work priorities and professional development |
|
|
|
|
|
|
|
|
|
| 5 |
DRTOGON15B |
Manage subordinates and equipment |
|
|
|
|
|
|
|
|
|
| 5 |
DRTNHB50A |
Manage business operations |
|
|
|
|
|
|
|
|
|
| 5 |
DRTNHB53A |
Manage non-routine, complex situations |
|
|
|
|
|
|
|
|
|
| 5 |
BSBFLM505A |
Manage operational plan |
BSBFLM505C |
Manage operational plan |
|
|
|
|
|
|
|
| 5 |
BSBFLM509B |
Facilitate continuous improvement |
|
|
|
|
|
|
|
|
|
| 5 |
BSBFLM510B |
Facilitate and capitalise on change and innovation |
|
|
|
|
|
|
|
|
|
| 6 |
BSBMGT608A |
Manage innovation and continuous improvement |
|
|
|
|
|
|
|
|
|
| 6 |
BSBMGT601A |
Contribute to strategic direction |
|
|
|
|
|
|
|
|
|
| 6 |
BSBMGT602A |
Contribute to the development and implementation of strategic plans |
|
|
|
|
|
|
|
|
|
| 6 |
BSBMGT603A |
Review and develop business plans |
|
|
|
|
|
|
|
|
|
| 6 |
BSBMGT604A |
Manage business operations |
|
|
|
|
|
|
|
|
|
| 6 |
MNCG1126A |
Conduct business negotiations |
RIIBEF601A |
Conduct business negotiations |
|
| 6 |
MNMMSM615A |
Conduct business negotiations |
|
| 6 |
MNQGEN664A |
Conduct business negotiations |
|
|
|
|
|
|
|
| 6 |
MNMMSM611A |
Evaluate and enhance mine site performance |
RIIBEF602A |
Establish and evaluate operational performance management system |
|
| 6 |
MNQGEN662A |
Establish operational performance management system |
|
|
|
|
|
|
|
| 6 |
MNMMSM604A |
Manage the decision making process |
|
|
|
|
|
|
|
|
|
| 6 |
MNQGEN661A |
Conduct feasibility study |
|
|
|
|
|
|
|
|
|
| 6 |
MNMMSM610A |
Resource mine site plans and objectives |
|
|
|
|
|
|
|
|
|
| 1.9 Financial Administration & Management |
|
|
|
|
|
|
|
|
|
| 3 |
MNCG1030A |
Conduct purchasing |
BSBPUR301B |
Purchase goods and services |
|
|
|
|
|
|
|
| 4 |
BSBSBM402A |
Undertake financial planning |
|
|
|
|
|
|
|
|
|
| 4 |
DRTNHB48A |
Manage financial resources |
BSBCMN308B |
Process payroll |
|
|
|
|
|
|
|
| 4 |
BSBCMN408A |
Report on financial activity |
|
|
|
|
|
|
|
|
|
| 4 |
BSBSBM406A |
Manage finances |
BSBFLM513B |
Manage budgets and financial plans |
|
| 5 |
BSBFLM513A |
Manage budgets and financial plans within the work team |
|
| 5 |
BSBMGT504A |
Manage budgets and financial plans |
|
|
|
|
|
|
|
| 5 |
BSBMGT503A |
Prepare budgets and financial plans |
|
|
|
|
|
|
|
|
|
| 5 |
PRDSIS24A |
Maintain financial records |
|
|
|
|
|
|
|
|
|
| 1.10 Information Management |
|
|
|
|
|
|
|
|
|
| 2 |
ICAITU128A |
Operate a personal computer |
BSBCMN107B |
Operate a personal computer |
|
| 2 |
MNCG1025A |
Access, update and retrieve simple computerised information |
|
| 2 |
PMCSUP282A |
Use computers and related programs in the workplace |
|
|
|
|
|
|
|
| 2 |
MNCG1026A |
Operate a computer to produce documents |
BSBCMN213B |
Produce simple word processed documents |
|
|
|
|
|
|
|
| 2 |
MNCG1027A |
Use keyboard skills and advanced functions of software packages to produce complex documents |
ICAITU126B |
Use advanced features of computer applications |
|
| 2 |
MNCG1028A |
Use advanced functions of software packages to produce documents, reports and worksheets |
|
|
|
|
|
|
|
| 2 |
MNCG1029A |
Transfer information through a computer |
BSBCMN220A |
Communicate electronically |
|
|
|
|
|
|
|
| 3 |
BSBRKG304A |
Maintain business records |
BSBRKG304B |
Collate, analyse and maintain business records |
|
| 3 |
BCCCM3004B |
Maintain site records |
|
| 3 |
MNMPPD301A |
Check and evaluate records and documentation |
|
|
|
|
|
|
|
| 3 |
MNMPPD302A |
Complete import/export documentation |
TDTA997C |
Complete and check import/export documentation |
|
| 3 |
TDTE897B |
Process workplace documents |
|
|
|
|
|
|
|
| 3 |
MNMPPD304A |
Maintain container/bulk cargo records |
TDTA297B |
Maintain container/cargo records |
|
| 3 |
TDTA297B |
Maintain container/cargo records |
|
|
|
|
|
|
|
| 4 |
BSBFLM406B |
Implement workplace information system |
|
|
|
|
|
|
|
|
|
| 4 |
BSBRKG403A |
Set up a business or records system for a small office |
|
|
|
|
|
|
|
|
|
| 5 |
BSBFLM506B |
Manage workplace information systems |
|
|
|
|
|
|
|
|
|
| 6 |
BSBMGT607A |
Manage knowledge and information |
|
|
|
|
|
|
|
|
|
| 1.11 Customer & Community Relations - RIICCR |
|
|
|
|
|
|
|
|
|
| 3 |
BSBCMN310A |
Deliver and monitor a service to customers |
|
|
|
|
|
|
|
|
|
| 3 |
MNQGEN351A |
Conduct weighbridge operations |
TDTD2289B |
Conduct weighbridge operations |
|
| 2 |
TDTD2289B |
Conduct weighbridge operations |
|
|
|
|
|
|
|
| 4 |
BSBCMN410A |
Coordinate implementation of customer service strategies |
|
|
|
|
|
|
|
|
|
| 4 |
LGAMIN417A |
Conduct community consultation |
|
|
|
|
|
|
|
|
|
| 4 |
MNQGEN403A |
Foster positive community relations |
RIICCR403 |
Develop and maintain positive community relations |
|
| 4 |
LGACOMP024A |
Develop community relations |
|
|
|
|
|
|
|
| 5 |
MNQGEN552A |
Conduct sales in construction materials operations |
|
|
|
|
|
|
|
|
|
| 5 |
BSBFLM507B |
Manage quality customer service |
BSBFLM507C |
Manage quality customer service |
|
| 5 |
PRDSIS27A |
Maintain client relations |
|
|
|
|
|
|
|
| 5 |
DRTNHB52A |
Manage client services |
BSBMGT603B |
Manage customer relationships |
|
| 6 |
BSBMGT606A |
Manage customer focus |
|
|
|
|
|
|
|
| 1.12 Project Management |
|
|
|
|
|
|
|
|
|
| 4 |
BSBPM408A |
Apply contract and procurement techniques |
|
|
|
|
|
|
|
|
|
| 4 |
LGACOM401A |
Administer contracts |
|
|
|
|
|
|
|
|
|
| 4 |
LGACOM402A |
Arrange contracts |
|
|
|
|
|
|
|
|
|
| 4 |
LGACOM409A |
Prepare tender documentation |
|
|
|
|
|
|
|
|
|
| 4 |
LGACOM410A |
Prepare response to tenders |
|
|
|
|
|
|
|
|
|
| 4 |
BSBCMN419A |
Manage projects |
|
|
|
|
|
|
|
|
|
| 5 |
BSBPM501A |
Manage application of project integrative processes |
|
|
|
|
|
|
|
|
|
| 5 |
BSBPM502A |
Manage project scope |
|
|
|
|
|
|
|
|
|
| 5 |
BSBPM503A |
Manage project time |
|
|
|
|
|
|
|
|
|
| 5 |
BSBPM504A |
Manage project costs |
|
|
|
|
|
|
|
|
|
| 5 |
BSBPM505A |
Manage project quality |
|
|
|
|
|
|
|
|
|
| 5 |
BSBPM506A |
Manage project human resources |
|
|
|
|
|
|
|
|
|
| 5 |
BSBPM507A |
Manage project communications |
|
|
|
|
|
|
|
|
|
| 5 |
BSBPM508A |
Manage project risk |
|
|
|
|
|
|
|
|
|
| 5 |
BSBPM509A |
Manage project procurement |
|
|
|
|
|
|
|
|
|
| 5 |
LGAWORKS502A |
Prepare detailed works project documentation |
|
|
|
|
|
|
|
|
|
| 5 |
LGAWORKS503A |
Undertake project investigation |
|
|
|
|
|
|
|
|
|
| 5 |
MNCG1081A |
Implement, monitor, rectify and report on contracts |
|
|
|
|
|
|
|
|
|
| 6 |
BSBPM601A |
Direct the integration of multiple projects/programs |
|
|
|
|
|
|
|
|
|
| 6 |
BSBPM602A |
Direct the scope of multiple projects/programs |
|
|
|
|
|
|
|
|
|
| 6 |
BSBPM603A |
Direct time management of multiple projects/programs |
|
|
|
|
|
|
|
|
|
| 6 |
BSBPM604A |
Direct cost management of multiple projects/programs |
|
|
|
|
|
|
|
|
|
| 6 |
BSBPM605A |
Direct quality management of multiple projects/programs |
|
|
|
|
|
|
|
|
|
| 6 |
BSBPM606A |
Direct human resource management of multiple projects/programs |
|
|
|
|
|
|
|
|
|
| 6 |
BSBPM607A |
Direct communications management of multiple projects/programs |
|
|
|
|
|
|
|
|
|
| 6 |
BSBPM608A |
Direct risk management of multiple projects/programs |
|
|
|
|
|
|
|
|
|
| 6 |
BSBPM609A |
Direct procurement and contracts of multiple projects/programs |
BSBPM605B |
Direct procurement of contracts and multiple projects/programs |
|
| 6 |
MNCG1125A |
Initiate, monitor and supervise contracts |
|
| 6 |
MNMMSM612A |
Initiate, monitor and supervise contracts |
|
| 6 |
MNQGEN663A |
Initiate, monitor and supervise contracts |
|
|
|
|
|
|
|
| 1.13 Training & Assessment |
|
|
|
|
|
|
|
|
|
| 3 |
TAAASS301A |
Contribute to assessment |
|
|
|
|
|
|
|
|
|
| 3 |
BSZ404A |
Train small groups |
TAADEL391A |
Provide training throughinstruction and demonstartion of work skills |
|
| 3 |
TAADEL301A |
Provide training through instruction and demonstartion of work skills |
|
|
|
|
|
|
|
| 4 |
DRTNHB23A |
Carry out informal on the job training |
BSBCMN404A |
Develop teams and individuals |
|
| 4 |
BSBCMN404A |
Develop teams and individuals |
|
|
|
|
|
|
|
| 4 |
TAAASS401A |
Plan and organise assessment |
TAAASS401A |
Plan and organise assessment |
|
| 4 |
BSZ401A |
Plan assessment |
|
|
|
|
|
|
|
| 4 |
TAAASS402A |
Assess competence |
TAAASS402A |
Assess competence |
|
| 4 |
BSZ402A |
Conduct assessment |
|
|
|
|
|
|
|
| 4 |
TAAASS404A |
Participate in assessment validation |
TAAASS404A |
Participate in assessment validation |
|
| 4 |
BSZ403A |
Review assessment |
|
|
|
|
|
|
|
| 4 |
BSZ406A |
Plan a series of training sessions |
TAADEL401A |
Plan and organise group-based delivery |
|
|
|
|
|
|
|
| 4 |
BSZ407A |
Deliver training sessions |
TAADEL402A |
Facilitate group0based learning |
|
|
|
|
|
|
|
| 4 |
BSZ405A |
Plan and promote a training program |
TAADES402A |
Design and develop learning programs |
|
|
|
|
|
|
|
| 4 |
BSZ408A |
Review training |
TAATAS401A |
Maintain information requirements of training and/or assessment organisations |
|
|
|
|
|
|
|
| 2. Technical Fields of Competence Applicable to All Sectors |
|
|
|
|
|
|
|
|
|
| 2.1 Blasting Hole Drilling - RIIBHD |
|
|
|
|
|
|
|
|
|
| 3 |
MNMEGS313A |
Prepare drill site |
RIIBHD201 |
Set up and prepare for surface drilling operations |
|
| 2 |
DRTNHB20A |
Set up and prepare for open-cut drilling operations |
|
| 3 |
MNMODB301A |
Set up and prepare for open-cut drilling operations |
|
|
|
|
|
|
|
| 2 |
MNCU1050A |
Conduct rotational drilling |
RIIBHD202 |
Conduct rotational drilling |
|
| 3 |
DRTNHB27A |
Conduct air drilling |
|
|
|
|
|
|
|
| 3 |
DRTNHB37A |
Conduct raise boring |
RIIBHD301 |
Conduct raise boring |
|
| 3 |
MNMUDB305A |
Conduct raise boring/drilling |
|
|
|
|
|
|
|
| 3 |
MNMUDB311A |
Conduct underground development drilling |
|
|
|
|
|
|
|
|
|
| 3 |
MNCO1011A |
Conduct burden and coal drilling operations |
RIIBHD304 |
Conduct surface blast hole drilling |
|
| 3 |
MNMODB302A |
Drill in open-cut environment |
|
| 3 |
MNQOPS312A |
Conduct blast hole drilling operations |
Note: |
Top hammer and bottom hammer drilling may also belong here |
|
|
|
| 5 |
MNQOPS512A |
Manage blast hole drilling operations |
RIIBHD501 |
Manage blast hole drilling operations |
|
| 5 |
MNMMMG505A |
Plan and oversee drilling operations |
Note: |
DRTNHB49A may have similar outcomes |
|
|
|
|
|
|
|
| 2.2 Blasting - RIIBLA |
|
|
|
|
|
|
|
|
|
| 2 |
MNMG205A |
Maintain magazine |
RIIBLA201 |
Support surface shotfiring operations |
|
| 2 |
MNMUGC108A |
Maintain magazine |
|
| 2 |
MNMOCC103A |
Prepare for blasting |
|
| 2 |
MNMUGC118A |
Charge underground blasts |
|
| 2 |
MNMG210A |
Store, handle and transport explosives |
|
| 3 |
MNQOPS313A |
Handle and transport explosives |
|
| 2 |
MNCO1041A |
Support shotfiring operations |
|
|
|
|
|
|
|
| 2 |
MNCU1049A |
Support shotfiring operations |
RIIBLA202 |
Support underground shotfiring operations |
|
|
|
|
|
|
|
| 2 |
MNMG241A |
Conduct mobile mixing of explosives |
RIIBLA203 |
Conduct mobile mixing of explosives |
|
|
|
|
|
|
|
| 3 |
MNMG313A |
Charge blast holes |
RIIBLA301 |
Conduct surface shotfiring operations |
|
| 3 |
MNMG353A |
Fire surface blasts |
|
| 3 |
MNMOCC104A |
Conduct blasting operations |
|
| 3 |
MNCO1040A |
Conduct shotfiring operations |
|
| 4 |
MNQOPS413A |
Conduct shotfiring operations |
|
| 3 |
MNMG322A |
Initiate blasts by remote control |
|
| 4 |
MNMG412A |
Initiate blast |
|
| 3 |
MNQOPS311A |
Conduct blast survey |
|
| 3 |
MNMG352A |
Apply blasting activities |
|
| 4 |
MNMG414A |
Monitor and control the effects of blasting on the environment |
|
|
|
|
|
|
| 3 |
MNCU1048A |
Conduct shotfiring operations |
RIIBLA302 |
Conduct shotfiring operations in underground coal mines |
|
|
|
|
Note: |
Coal have requested a separate underground shotfiring unit |
|
| 3 |
MNMG323A |
Charge development blast holes |
RIIBLA303 |
Conduct underground development shotfiring |
|
|
|
|
Note: |
Metalliferous have requested separate underground shot firing units |
|
| 3 |
MNMG321A |
Charge production blast holes |
RIIBLA304 |
Conduct underground production shotfiring |
|
|
|
|
|
|
|
| 3 |
MNMG311A |
Conduct secondary blasting |
RIIBLA305 |
Conduct secondary blasting |
|
|
|
|
|
|
|
| 3 |
MNMG349A |
Conduct accretion firing |
RIIBLA306 |
Conduct accretion firing |
|
|
|
|
|
|
|
| 4 |
MNMMN1401A |
Administer shotfiring activities |
RIIBLA401 |
Apply blasting system |
|
| 4 |
MNMG406A |
Manage blasting activities |
|
| 5 |
MNQOPS513A |
Manage blasting activities |
|
|
|
|
|
|
|
| 5 |
MNQOPS511A |
Design surface blasts |
RIIBLA601 |
Establish a blasting system |
|
| 6 |
MNMMSM626A |
Establish a blasting system |
|
|
|
|
|
|
|
| 2.3 Service & Maintenance - RIISAM |
|
|
|
|
|
|
|
|
|
| 1 |
RIIG2007A |
Read and interpret plans and specifications |
|
|
|
|
|
|
|
|
|
| 1 |
RIIG2006A |
Handle resources and infrastructure materials and safely dispose of non toxic materials |
RIISAM201 |
Handle resources and infrastructure materials and safely dispose of non toxic materials |
|
| 2 |
BCCCM1005B |
Handle construction materials and safely dispose of non-toxic materials |
|
|
|
|
|
|
|
| 2 |
MNCO1032A |
Isolate and access plant |
RIISAM202 |
Isolate and access plant |
|
| 3 |
MNMG350A |
Carry out plant isolation and tagging |
|
|
|
|
|
|
|
| 1 |
RIIG2003A |
Use hand and power tools |
RIISAM203 |
Use hand and power tools |
|
| 2 |
BCCCM2001B |
Use civil construction hand and power tools |
|
|
|
|
|
|
|
| 1 |
RIIG2004A |
Operate small plant & equipment |
RIISAM204 |
Operate small plant & equipment |
|
| 2 |
BCCCM2002B |
Use small plant and equipment |
|
|
|
| 3 |
MNMSM305A |
Operate small open cut mine equipment |
Note: |
NSW Coal advise similar coverage in MNCG1060A |
|
|
|
|
|
|
|
| 2 |
BCGSF2003B |
Cut and bend material using Oxy-LPG equipment |
RIISAM205 |
Perform basic cutting and welding |
|
| 2 |
MNCG1038A |
Perform basic cutting and welding |
Note: |
CMPA recommend specific unit on welding special steels |
|
|
|
|
|
|
|
| 2 |
BCGCM2007B |
Use explosive power tools |
Note: |
NSW Coal recommend use of 'National Standard' |
|
|
|
|
|
|
|
| 2 |
PMCCOR102A |
Clean plant and equipment |
RIISAM207 |
Apply operational maintenance skills |
|
| 2 |
MNCG1035A |
Apply operational maintenance skills |
|
| 2 |
MNMG215A |
Apply operational maintenance skills |
|
| 2 |
DRTNHB22A |
Carry out operational maintenance |
|
| 2 |
MNCP1009A |
Perform plant operational maintenance |
|
| 2 |
MNMEGS309A |
Carry out operational maintenance |
|
|
|
|
|
|
|
| 2 |
MNMOMS203A |
Position and set up mobile lighting |
|
|
|
|
|
|
|
|
|
| 2 |
AUR17665A |
Remove, fit and adjust wheel(s) |
RIISAM210 |
Remove, fit and adjust wheel(s) |
|
| 2 |
MNCG1031A |
Remove, fit and adjust wheel(s) |
|
|
|
|
|
|
|
| 2 |
AUR17966A |
Remove, repair and refit tyres and tubes |
RIISAM211 |
Remove, repair and refit tyres and tubes |
|
| 2 |
MNCG1032A |
Remove, repair and refit tyres and tubes |
|
|
|
|
|
|
|
| 2 |
MNCG1037A |
Service mine plant and equipment |
RIISAM212 |
Service mine plant and equipment |
|
| 2 |
MNMG216A |
Service mine plant and equipment |
|
|
|
|
|
|
|
| 3 |
PMLTEST302A |
Calibrate testing equipment and assist with its maintenance |
|
|
|
|
|
|
|
|
|
| 3 |
MNCG1068A |
Test operational functions of vehicles and equipment |
Note: |
NSW Coal recommend comparison withMNMOLH310A in 3.3 |
|
|
|
|
|
|
| 4 |
FPPSTM4A |
Troubleshoot and rectify boiler plant system faults |
|
|
|
|
|
|
|
|
|
| 3 |
MNCG1056A |
Install, commission and maintain major conveyor equipment and systems |
|
|
|
|
|
|
|
|
|
| 3 |
MNCG1057A |
Repair and splice conveyor belting |
|
|
|
|
|
|
|
|
|
| 3 |
MNQOPS355A |
Service and maintain crushers |
|
|
|
|
|
|
|
|
|
| 3 |
MNQOPS356A |
Service and maintain screens |
|
|
|
|
|
|
|
|
|
| 3 |
MNQOPS357A |
Service and maintain conveyors, feeders and hoppers |
|
|
|
|
|
|
|
|
|
| 3 |
MNQOPS358A |
Service and maintain pumps |
|
|
|
|
|
|
|
|
|
| 3 |
MNMSM312A |
Install and commission small mine plant, machinery and services |
|
|
|
|
|
|
|
|
|
| 3 |
MNMULH313A |
Maintain winder equipment |
|
|
|
|
|
|
|
|
|
| 3 |
MNMULH314A |
Inspect and maintain shafts and structures |
|
|
|
|
|
|
|
|
|
| 3 |
MNMULH315A |
Monitor, inspect and service ropes and attachments |
|
|
|
|
|
|
|
|
|
| 3 |
DRTOG34B |
Manage equipment maintenance |
RIISAM401 |
Apply and monitor site plant, equipment and infrastructure maintenance management plan |
|
| 4 |
DRTNHB47A |
Manage equipment maintenance |
|
| 4 |
MNCO1127A |
Apply and monitor site plant, equipment and infrastructure maintenance management plan |
|
| 4 |
MNQOPS450A |
Apply and monitor site plant, equipment and infrastructure maintenance management plan |
|
|
|
|
|
|
|
| 4 |
MNQOPS427A |
Supervise operation of electrical equipment and installations |
Note: |
Metalliferous rcomend there only be on maintenance management unit at ths level. |
|
|
|
|
|
|
|
| 4 |
MNMMSU410A |
Commission/recommission plant |
|
|
|
|
|
|
|
|
|
| 4 |
PMASUP441B |
Decommission plant |
|
|
|
|
|
|
|
|
|
| 5 |
MNCG1083A |
Implement, monitor, rectify and report on maintenance management systems |
RIISAM501 |
Implement and maintain the site plant, equipment and infrastructure maintenance plan |
|
| 5 |
MNCO1126A |
Implement and maintain the site plant, equipment and infrastructure maintenance plan |
|
| 5 |
MNQOPS550A |
Implement and maintain the site plant, equipment and infrastructure maintenance plan |
|
|
|
|
|
|
|
| 6 |
MNCO1125A |
Establish plant, equipment and infrastructure maintenance system |
RIISAM601 |
Establish plant, equipment and infrastructure maintenance system |
|
| 6 |
MNMMSM620A |
Establish plant, equipment and infrastructure maintenance system |
|
| 6 |
MNQOPS650A |
Establish plant, equipment and infrastructure maintenance system |
|
|
|
|
|
|
|
| 6 |
MNCG1130A |
Establish maintenance management system for mechanical plant and equipment |
|
|
|
| |
|
|
|
|
|
| 2.4 Load Handling - RIIHAN |
|
|
|
|
|
|
|
|
|
| 2 |
MNCG1048A |
Conduct forklift operations |
TDT1097B |
Operate a forklift |
|
| 2 |
MNMG238A |
Conduct forklift operations |
|
| 2 |
TDTD1097B |
Operate a forklift |
|
|
|
|
|
|
|
| 2 |
DRTOGOF06B |
Handle and store cargo |
TDTD2698B |
Plan and organise movement and storage of bulk materials |
|
| 2 |
DRTOGON07B |
Move loads |
|
|
|
|
|
|
|
| 2 |
MNCG1033A |
Conduct lifting operations |
|
|
|
|
|
|
|
|
|
| 2 |
MNMPPD207A |
Prepare and load for transport |
TDTD497B |
Load and unload cargo/goods |
|
|
|
|
|
|
|
| 2 |
MNMPPD209A |
Secure cargo |
TDTA197B |
Secure Cargo |
|
|
|
|
|
|
|
| 2 |
MNMPPD210A |
Transfer cargo |
TDTA897B |
Transport Cargo |
|
|
|
|
|
|
|
| 2 |
MNMG217A |
Transport plant, equipment and personnel |
|
|
|
|
|
|
|
|
|
| 2 |
MNMG240A |
Operate personnel cage/platform |
BCGRI3001B |
Operate personnel and materials hoists |
|
|
|
|
|
|
|
| 2 |
MNCG1043A |
Conduct dogging operations |
BCGOHS3005A |
Perform dogging |
|
| 2 |
MNMG207A |
Conduct dogging operations |
|
|
|
|
|
|
|
| 2 |
MNCG1044A |
Conduct basic rigging operations |
BCGOHS3006A |
Perform rigging - basic |
|
| 2 |
MNMG208A |
Conduct basic rigging operations |
|
|
|
|
|
|
|
| 2 |
MNCG1045A |
Conduct intermediate rigging operations |
BCGOHS3007A |
Perform rigging - intermediate |
|
| 2 |
MNMG209A |
Conduct intermediate rigging operations |
|
|
|
|
|
|
|
| 3 |
BCGCM3001B |
Operate elevated work platform |
BCGCM3001B |
Operate elevated work platform |
|
| 3 |
MNCG1049A |
Operate elevating work platform |
|
|
|
|
|
|
|
| 2 |
BCCOHS2001A |
Erect and dismantle scaffolding - basic |
BCGOHS2001A |
Erect and dismantle scaffolding - basic |
|
| 2 |
BCGCM2008B |
Erect and dismantle restricted height scaffolding |
|
| 2 |
MNCG1046A |
Conduct basic scaffolding operations |
|
|
|
|
|
|
|
| 3 |
MNCG1047A |
Conduct intermediate scaffolding operations |
BCGOHS3001A |
Erect and dismantle scaffolding - intermediate |
|
|
|
|
|
|
|
| 3 |
BCCPO3010B |
Conduct integrated tool carrier operations |
RIIHAN301A |
Conduct integrated tool carrier operations |
|
| 3 |
MNMG347A |
Conduct integrated tool carrier operations |
|
|
|
|
|
|
|
| 3 |
TDTD1197B |
Conduct specialised forklift operations |
|
|
|
|
|
|
|
|
|
| 3 |
MNCG1041A |
Conduct non-slewing crane operations |
TDTOHS3003A |
Operate non-slewing mobile crane |
|
| 2 |
MNMG234A |
Conduct non-slewing crane operations |
|
|
|
|
|
|
|
| 3 |
MNCG1042A |
Conduct slewing crane operations |
RIIHAN302A |
Conduct slewing crane operations |
|
| 3 |
MNMG335A |
Conduct slewing crane operations |
|
|
|
|
|
|
|
| |
|
|
TDTOHS3004A |
Operate a mobile crane to 20 tonnes |
|
| |
|
|
TDTOHS3005A |
Operate a mobile crane to 60 tonnes |
|
| |
|
|
TDTOHS3006A |
Operate a mobile crane to 100 tonnes |
|
| |
|
|
TDTOHS3007A |
Operate a mobile crane to over 100 tonnes |
|
|
|
|
|
|
|
| 3 |
MNCG1040A |
Operate gantry crane |
TDTOHS3010A |
Operate bridge and gantry cranes |
|
| 2 |
MNMG236A |
Operate overhead cranes |
|
|
|
|
|
|
|
| 3 |
MNMG339A |
Carry out lifts using multiple cranes |
RIIHAN303 |
Carry out lifting using multiple cranes |
|
|
|
|
|
|
|
| 3 |
BCGCM3002B |
Operate a truck mounted loading crane |
TDTOHS3002A |
Operate a vehicle mounted loading crane |
|
| 3 |
MNCG1050A |
Operate vehicle loading crane |
|
| 3 |
MNMG232A |
Operate vehicle loading crane |
|
|
|
|
|
|
|
| 3 |
BCCPO3020B |
Load and unload plant |
RIIHAN304
|
Load and unload plant |
|
|
|
|
|
|
|
| 4 |
MNMPPD405A |
Organise and monitor wharf/terminal operations |
TDTA697B |
Organise and monitor wharf/terminal operations |
|
|
|
|
|
|
|
| 4 |
MNMPPD408A |
Process movement of containers and cargo |
TDTA497A |
Process movement of containers and cargo |
|
|
|
|
|
|
|
| 2.5 Vehicle Operations RIIVEH |
|
|
|
| 1 |
RIIG2005A |
Operate light vehicles |
TDTC197B |
Drive vehicle |
|
| 2 |
MNCG1061A |
Operate light vehicle |
|
| 2 |
MNMOMS207A |
Operate light vehicle |
|
|
|
|
|
|
|
| 2 |
MNCG1062A |
Operate medium vehicle |
TDTC397B |
Operate a medium vehicle |
|
| 2 |
MNQOPS262A |
Operate medium vehicle |
|
|
|
|
|
|
|
| 3 |
MNMG319A |
Operate mine services vehicle |
|
|
|
|
|
|
|
|
|
| 3 |
MNMEGS312A |
Drive and recover a four-wheel-drive vehicle |
TDTC2501A |
Operate a four wheel drive vehicle |
|
|
|
|
|
|
|
| 3 |
MNCU1013A |
Conduct rail vehicle operations |
RIIVEH301A |
Conduct rail haulage operations |
|
| 3 |
MNMULH307A |
Conduct rail haulage operations |
|
|
|
|
|
|
|
| 3 |
MNCG1063A |
Operate heavy rigid vehicles |
TDTC497C |
Drive heavy rigid vehicle |
|
|
|
|
|
|
|
| 3 |
MNCG1064A |
Operate articulated vehicles |
TDTC597C |
Drive heavy combination vehicle |
|
|
|
|
|
|
|
| 3 |
MNCG1065A |
Operate multi-combination vehicles on mine sites |
RIIVEH302A |
Operate multi-combination vehicle |
|
|
|
|
|
|
|
| 2.6 Sampling, Testing & Data Processing & Recording - RIISTD |
|
|
|
|
|
|
|
|
|
| 1 |
RIIG2002A |
Carryout measurement and calculations |
|
|
|
|
|
|
|
|
|
| 1 |
RIIG005A |
Read and interpret maps |
|
|
|
|
|
|
|
|
|
| 1 |
RIIG006A |
Collect and prepare samples |
PMASAMP200A |
Collect routine site samples |
|
| 2 |
MNCP1005A |
Conduct sampling operations |
|
| 2 |
MNMPGP210A |
Take samples |
|
| 2 |
MNQGEN231A |
Conduct sampling operations |
|
| 2 |
MNMEGS204A |
Collect and prepare samples |
|
| 4 |
PMLSAMP400B |
Obtain representative samples in accordance with sampling plan |
|
|
|
|
|
|
|
| 3 |
MNMMEN304A |
Take environmental samples and measurements |
|
This units to be considered as a separate unit |
|
|
|
|
|
|
|
| 4 |
PMLTEST403A |
Assist with geotechnical site investigations |
PMLTEST403B |
Assist with geotechnical site investigations |
|
|
|
|
|
|
|
| 3 |
PMLSAMP302A |
Receive and prepare samples for testing |
|
|
|
|
|
|
|
|
|
| 3 |
PMLTEST303B |
Prepare working solutions |
|
|
|
|
|
|
|
|
|
| 4 |
PMLTEST402B |
Prepare, standardise and use solutions |
|
|
|
|
|
|
|
|
|
| 3 |
PMLTEST307B |
Prepare trial batches for evaluation |
|
|
|
|
|
|
|
|
|
| 3 |
PMCSUP392A |
Perform basic laboratory tests |
PMLTEST300B |
Perform basic tests |
|
| 3 |
PMLTEST300B |
Perform basic tests |
|
| 3 |
MNQGEN332A |
Conduct site laboratory operations |
|
|
|
|
|
|
|
| 4 |
PMLTEST404A |
Perform chemical tests and procedures |
|
|
|
|
|
|
|
|
|
| 4 |
PMLTEST406A |
Perform physical tests |
|
|
|
|
|
|
|
|
|
| 4 |
PMLTEST411A |
Perform mechanical tests |
|
|
|
|
|
|
|
|
|
| 3 |
PMLDATA300A |
Process and record data |
PMLDATA300A |
Process and record data |
|
| 3 |
MNMEGS306A |
Process data and maintain accurate records |
|
| 4 |
PMLDATA400A |
Process and interpret data |
|
|
|
|
|
|
|
| 5 |
PMLTEST511B |
Supervise earthworks inspection, sampling and testing operations |
|
|
|
|
|
|
|
|
|
| 5 |
PMLTEST520A |
Perform complex tests to measure engineering properties of materials |
|
|
|
|
|
|
|
|
|
| 5 |
PMLDATA500B |
Analyse data and report results |
|
|
|
|
|
|
|
|
|
| 4 |
PMLORG600A |
Supervise laboratory operations in work/functional area |
|
|
|
|
|
|
|
|
|
| 2.7 Emergency Response & Rescue - RIIERR |
|
|
|
|
|
|
|
|
|
| 2 |
MNCG1013A |
Apply initial response First Aid |
HLTFA1A |
Apply basic First Aid |
|
| 2 |
MNMG204A |
Perform initial response first aid |
|
| 2 |
HLTFA1A |
Apply basic First Aid |
|
| 2 |
PUAEME002B |
Manage injuries at emergency incident |
|
|
|
|
|
|
|
| 2 |
MNCG1010A |
Assess and implement life support systems and stabilise casualties |
HLTFA2A |
Apply advanced First Aid |
|
| 2 |
HLTFA2A |
Apply advanced First Aid |
|
| 3 |
PUAEME001A |
Provide emergency care |
|
|
|
|
|
|
|
| 2 |
PMAOHS211A |
Prepare equipment for emergency response |
|
|
|
|
|
|
|
|
|
| 2 |
PUADEFEO201A |
Respond to fire |
RIIERR201 |
Conduct fire team operations |
|
| 2 |
MNCG1005A |
Conduct fire team operations |
|
|
|
|
|
|
|
| 2 |
PUAFIR207A |
Operate breathing apparatus open circuit |
Note: |
NSW Coal recommend use of National Standard if it exists |
|
|
|
|
|
|
|
| 2 |
DRTOG09B |
Contribute to the control of emergencies and critical situations |
|
|
|
|
|
|
|
|
|
| 3 |
PUAFIR306A |
Render hazardous materials incidents safe |
|
|
|
|
|
|
|
|
|
| 3 |
DRTOG14B |
Control emergencies and critical situations |
RIIERR301 |
Respond to local emergencies and incidents |
|
| 3 |
MNCG1004A |
Respond to local emergencies and incidents |
|
| 3 |
MNMG330A |
Respond to local emergencies and incidents |
|
|
|
|
|
|
|
| 3 |
MNMRR310A |
Provide support for rescue operations |
|
|
|
|
|
|
|
|
|
| 3 |
MNMRR411A |
Lead rescue team |
|
|
|
|
|
|
|
|
|
| 3 |
MNMRR301A |
Respond to mine incident |
|
|
|
|
|
|
|
|
|
| 3 |
MNCG1011A |
Extricate and transport people involved in incidents |
|
|
|
|
|
|
|
|
|
|
|
|
Note: |
Metalliferous recommend the addition of a vehicle extrication unit |
|
|
|
|
|
|
| 4 |
MNCO1115A |
Apply and monitor surface mine emergency preparedness and response procedures |
RIIERR401 |
Apply and monitor surface operations emergency preparedness and response procedures |
|
| 4 |
MNMMSU409A |
Apply and monitor mine emergency preparedness and response procedures |
|
|
|
|
Note: |
Coal recommend separate open cut and underground unit for applying emergency response |
|
| 4 |
MNCU1153A |
Apply and monitor mine emergency preparedness and response procedures |
RIIERR402 |
Apply and monitor under ground operations emergency preparedness and response procedures |
|
|
|
|
|
|
|
| 4 |
PMAOMIR444A |
Develop incident containment tactics |
|
|
|
|
|
|
|
|
|
| 4 |
PUASAR004A |
Undertake vertical rescue |
|
|
|
|
|
|
|
|
|
| 4 |
PUASAR008A |
Search as a member of a land search team |
|
|
|
|
|
|
|
|
|
| 5 |
PUAAMS007A |
Coordinate search and rescue operations |
|
|
|
|
|
|
|
|
|
| 5 |
PUASAR005A |
Undertake confined space rescue |
|
|
|
|
|
|
|
|
|
| 5 |
MNCU1152A |
Implement mine emergency management system |
RIIERR503 |
Implement emergency preparedness and response systems |
|
| 5 |
MNMMMG515A |
Implement emergency preparedness and response systems |
|
|
|
|
|
|
|
| 6 |
MNCG1116A |
Establish mine emergency preparedness and response systems |
RIIERR601 |
Establish emergency preparedness and response systems |
|
| 6 |
MNCU1151A |
Establish mine emergency preparedness and response systems |
|
| 6 |
MNMMSM625A |
Establish and manage mine emergency preparedness and response systems |
|
|
|
|
Note: |
Coal recommend separate units for establish and manage emergencies |
|
| 5 |
MNCG1119A |
Manage major incidents and emergencies |
RIIERR602 |
Manage major incidents and emergencies |
|
| 6 |
MNQGEN602A |
Manage major incidents and emergencies |
|
|
|
|
|
|
|
| 3. Technical Fields of Competence Applicable to Some Sectors (2 to 4 Sectors) |
|
|
|
|
|
| |
|
|
|
|
|
| 3.1 Materials Extraction - RIIMEX |
|
|
|
|
|
|
|
|
|
| 2 |
MNMOMS202A |
Suppress dust in open-cut environment |
|
|
|
|
|
|
|
|
|
| 2 |
MNMODB203A |
Install open-cut mine ground support |
|
|
|
|
|
|
|
|
|
| 2 |
MNMG229A |
Break oversize rock |
|
|
|
|
|
|
|
|
|
| 3 |
MNMG344A |
Assess ground conditions |
|
|
|
|
|
|
|
|
|
| 3 |
MNMODR301A |
Dredge materials |
RIIMEX301 |
Conduct dredging operations |
|
| 3 |
MNMODR302A |
Shut down dredge for operator maintenance |
|
| 3 |
MNQOPS314A |
Conduct dredging operations |
|
|
|
|
|
|
|
| 2 |
MNQOPS214A |
Conduct workboat/barge operations |
|
|
|
|
|
|
|
|
|
| 4 |
MNCO1103A |
Apply pit plan |
RIIMEX401 |
Apply pit plan |
|
| 4 |
MNQOPS401A |
Apply pit plan |
|
| 4 |
MNMMSU402A |
Apply, monitor and report pit development systems |
|
|
|
|
|
|
|
| 4 |
RIICC431A |
Apply the principles of canal construction |
|
|
|
|
|
|
|
|
|
| 4 |
MNQOPS414A |
Supervise dredging operations |
|
|
|
|
|
|
|
|
|
| 4 |
MNMMSU405A |
Apply and monitor systems for stable mining |
RIIMEX404 |
Apply and monitor systems and methods of mining |
|
| 4 |
MNCO1046A |
Apply and monitor systems and methods of mining |
Note: |
May be seaparate units |
|
|
|
|
|
|
|
| 4 |
MNCU1138A |
Apply and monitor mine transport system and production equipment |
RIIMEX405 |
Apply and monitor mine transport system and production equipment |
|
| 4 |
MNMMSU406A |
Apply and monitor mine transport system and production equipment |
|
|
|
|
|
|
|
| 5 |
MNCO1102A |
Implement pit plan |
RIIMEX501 |
Implement pit plan |
|
| 5 |
MNMMMG502A |
Implement pit plan |
|
| 5 |
MNQOPS501A |
Implement pit plan |
|
|
|
|
|
|
|
| 5 |
MNMMMG511A |
Implement design systems for stable mining |
Note: |
NSW Coal recommend new title 'Implement syytems and methods of mining' |
|
|
|
|
|
|
|
| 5 |
MNQOPS514A |
Manage dredging operations |
Note: |
Metalliferous question need for dredging supervise and manage units |
|
|
|
|
|
|
|
| 6 |
MNCO1101A |
Plan pit development |
RIIMEX601 |
Plan pit development |
|
| 6 |
MNQOPS601A |
Plan pit development |
|
|
|
|
|
|
|
| 6 |
MNCO1135A |
Establish ground control and slope stability systems |
RIIMEX602 |
Establish ground control and slope stability systems |
|
| 6 |
MNMMSM628A |
Establish ground control and slope stability systems |
|
| 6 |
MNMMSM630A |
Establish ground control and stable mining systems |
|
|
|
|
|
|
|
| 6 |
MNMMSM629A |
Establish surface product haulage and transport systems |
|
|
|
|
|
|
|
|
|
| 6 |
MNMMSM613A |
Establish and implement operational management plans |
|
|
|
| |
|
|
|
|
|
| 3.2 Stockpile & Reclaim Material - RIISRM |
|
|
|
|
|
|
|
|
|
| 3 |
MNCP1006A |
Conduct stockpile dozer |
RIISRM301 |
Operate plant/machinery on live stockpiles |
|
| 3 |
MNMOSP304A |
Operate plant/machinery on live stockpiles |
|
| 3 |
MNMG345A |
Maintain stockpiles |
|
| 3 |
MNMG348A |
Move and position materials to form stockpile |
|
|
|
|
|
|
|
| 3 |
MNMG346A |
Blend stockpile material |
|
|
|
|
|
|
|
|
|
| 3 |
MNMG342A |
Conduct reclaim operations |
RIISRM302 |
Conduct stockpile reclaimer operations |
|
| 3 |
MNCP1007A |
Conduct stockpile reclaimer operations |
|
|
|
|
|
|
|
| 4 |
MNCO1112A |
Apply and monitor the site stockpile management plan |
RIISRM401 |
Apply and monitor the site stockpile management plan |
|
| 4 |
MNQOPS440A |
Apply site stockpile management plan |
|
|
|
|
|
|
|
| 5 |
MNCO1111A |
Implement the stockpile management plan |
RIISRM501 |
Implement the stockpile management plan |
|
| 5 |
MNQOPS540A |
Implement stockpile management plan |
|
| 5 |
MNMMMG508A |
Design stockpile formations and reclaiming systems |
|
|
|
|
|
|
|
| 6 |
MNCO1110A |
Establish the mine stockpile management system |
RIISRM601 |
Establish the stockpile management system |
|
| 6 |
MNMMSM622A |
Establish the stockpile management system |
|
| 6 |
MNQOPS640A |
Establish the stockpile management system |
|
|
|
|
|
|
|
| 3.3 Mobile Plant Operations - RIIMPO |
|
|
|
|
|
|
|
|
|
| 3 |
MNMOLH310A |
Service and handover mine plant and machines |
Note: |
Coal NSW recommend comparison with MNCG1068A in 2.3 |
|
|
|
|
|
|
| 2 |
MNQOPS232A |
Service and handover hydraulic shovels/excavators |
Note: |
Civil reecommend posible use of Delphi unit |
|
|
|
|
|
|
|
| 3 |
BCCPO3003B |
Conduct excavator operations |
RIIMPO301 |
Conduct hydralic excavator operations |
|
| 3 |
MNMOLH301A |
Conduct excavator operations |
|
| 3 |
MNMSM306A |
Conduct shovel/excavator operations |
|
| 3 |
MNCO1027A |
Conduct hydraulic shovel/excavator operations |
Note: |
Metalliferous recommend possible separate excavator & shovel units |
|
| 3 |
MNQOPS332A |
Conduct hydraulic shovel/excavator operations |
Note: |
Civil recommend possible use of Delphi units |
|
|
|
|
|
|
|
| 3 |
MNMSM306A |
Conduct shovel/excavator operations |
RIIMPO302 |
Conduct hydralic shovel operations |
|
| 3 |
MNCO1027A |
Conduct hydraulic shovel/excavator operations |
|
| 3 |
MNMOLH303A |
Conduct hydraulic shovel operations |
Note: |
Metalliferous recommend possible separate excavator & shovel units |
|
| 3 |
MNQOPS332A |
Conduct hydraulic shovel/excavator operations |
Note: |
Civil recommend possible use of Delphi units |
|
|
|
|
|
|
|
| 3 |
MNCO1012A |
Conduct rope shovel operations |
RIIMPO303 |
Conduct rope shovel operations |
|
| 3 |
MNMOLH302A |
Conduct electric rope shovel operation |
|
|
|
|
|
|
|
| 2 |
MNQOPS231A |
Service and handover front end loaders |
RIIMPO202 |
Operate wheel loader |
|
|
|
|
|
|
|
| 3 |
BCCPO3004B |
Conduct front end loader operations |
RIIMPO304 |
Conduct wheel loader operations |
|
| 3 |
MNCO1013A |
Conduct front end loader operations |
|
| 3 |
MNMOLH305A |
Conduct front end loader operations |
|
| 3 |
MNQOPS339A |
Conduct sales loader operations |
|
|
|
|
|
|
|
| 3 |
MNQOPS331A |
Conduct face loading operations |
Note: |
CMPA recommend separate face loader unit |
|
|
|
|
|
|
| 3 |
BCCPO3005B |
Conduct tracked front end loader operations |
Note: |
NSW Metailiferous recommend combining with skid steer, WA Metalliferous recommend not be combined. |
|
|
|
|
|
|
|
| 3 |
BCCPO3001B |
Conduct backhoe/loader operations |
Note: |
NSW Coal recommend use of 'National Standard' |
|
|
|
|
|
|
|
| 2 |
MNQOPS234A |
Service and handover dozers |
RIIMPO203 |
Operate a tracked dozer |
|
|
|
|
|
|
|
| 3 |
BCCPO3002B |
Conduct dozer operations |
RIIMPO308 |
Conduct tracked dozer operations |
|
| 3 |
MNCO1018A |
Conduct dozer operations |
|
| 3 |
MNMOLH307A |
Conduct dozer operations |
|
| 3 |
MNQOPS334A |
Conduct dozer operations |
|
|
|
|
|
|
|
| 3 |
MNCO1024A |
Conduct wheeled dozer operations |
|
|
|
|
|
|
|
|
|
| 2 |
MNQOPS236A |
Service and handover graders |
RIIMPO204 |
Operate a grader |
|
|
|
|
|
|
|
| 3 |
BCCPO3006B |
Conduct grader operations |
RIIMPO310 |
Conduct grader operations |
|
| 3 |
MNCO1016A |
Conduct grader operations |
|
| 3 |
MNMOMS306A |
Conduct grader operations |
|
| 3 |
MNQOPS336A |
Conduct grader operations |
|
|
|
|
Note: |
Coal recommend a separate unit for underground grader operations |
|
| 3 |
MNCU1016A |
Conduct wheeled grader operations |
RIIMPO311 |
Cunduct wheeled grader operations underground |
|
|
|
|
|
|
|
| 2 |
MNQOPS233A |
Service and handover haul trucks |
RIIMPO205 |
Operate haul trucks |
|
|
|
|
|
|
|
| 2 |
MNCO1015A |
Conduct bulk water truck operations |
RIIMPO206 |
Conduct bulk water truck operations |
|
| 2 |
MNQOPS237A |
Conduct bulk water truck operations |
|
| 3 |
BCCPO3014B |
Conduct water cart operations |
|
|
|
|
|
|
|
| 3 |
BCCPO3012B |
Conduct tip truck operations |
RIIMPO311 |
Conduct haul truck operations |
|
| 3 |
BCCPO3016B |
Conduct dump truck operations |
|
| 3 |
MNCO1014A |
Conduct haul truck operations |
|
| 3 |
MNMOLH306A |
Conduct haul truck operations |
|
| 3 |
MNQOPS333A |
Conduct haul truck operations |
|
|
|
|
|
|
|
| 2 |
MNQOPS235A |
Service and handover scrapers |
RIIMPO207 |
Operate scrapers |
|
|
|
|
|
|
|
| 3 |
BCCPO3007B |
Conduct scraper operations |
RIIMPO312 |
Conduct scraper operations |
|
| 3 |
MNCO1017A |
Conduct scraper operations |
|
| 3 |
MNMOLH308A |
Conduct scraper operations |
|
| 3 |
MNQOPS335A |
Conduct scraper operations |
|
|
|
|
|
|
|
| 2 |
MNMOMS204A |
Operate roller/compactor |
RIIMPO313 |
Conduct roller operations |
|
| 3 |
BCCPO3013B |
Conduct roller operations |
|
Note: Coal recommend that this unit be aligned to MNCG1060A |
|
| 3 |
BCCPO3017B |
Conduct self propelled compactor operations |
|
|
|
|
|
|
|
|
| 3 |
BCCPO3008B |
Conduct skid steer loader operations |
|
Note: Coal recommend that this unit be aligned to MNCG1060A |
|
|
|
|
|
|
| 2 |
MNCG1060A |
Operate support equipment |
|
|
|
|
|
|
|
|
| 3 |
BCCPO3011B |
Conduct tractor operations |
|
Note: Coal recommend that this unit be aligned to MNCG1060A |
|
|
|
|
|
|
| 4 |
LGAWORKS403A |
Manage civil plant and resources |
RIIMPO401 |
Supervise mobile plant operations |
|
| 4 |
MNQOPS430A |
Supervise mobile plant operations |
|
| 4 |
RIICC403A |
Apply the principles of earthworks construction |
|
| 4 |
MNCO1043A |
Monitor interaction of light and heavy vehicles and mining equipment |
Note: |
Coal recommend consideration of special requiremnts for OCE. |
|
|
|
|
|
|
|
| 5 |
MNCG1084A |
Implement, monitor, rectify and report on mobile plant and equipment systems |
Note: |
Metalliferous recommend possible combination with RIIMPO401 |
|
|
|
|
|
|
|
| 5 |
MNCO1047A |
Manage the interaction of heavy and light vehicles and mining equipment |
Note: |
NSW Coal recommend this be covered by a 'transport unit' |
|
|
|
|
|
|
|
| 5 |
MNCO1044A |
Manage laser leveling of operating plant |
|
|
|
|
|
|
|
|
|
| 3.4 Processing - RIIPRO |
|
|
|
|
|
|
|
|
|
| 2 |
MNMPHA209A |
Conduct mobile crushing plant operations |
RIIPRO201 |
Conduct crushing plant operations |
|
| 2 |
MNMPHA210A |
Conduct fixed crushing plant operations |
|
| 2 |
MNQOPS221A |
Conduct crushing operations |
|
|
|
|
|
|
|
| 2 |
MNQOPS226A |
Conduct screening operations |
Note: |
CMPA recommend inclusion of 'screening & conveying' |
|
|
|
|
|
|
|
| |
|
|
Note: |
Metalliferous recommend a 'Fine sizing unit' |
|
|
|
|
|
|
|
| 2 |
MNCO1036A |
Conduct mobile crushing and screen plant operations |
RIIPRO301 |
Conduct crushing and screening plant operations |
|
| 3 |
MNMPHA302A |
Conduct crushing and screening plant operations |
Note: |
Metalliferous WA recommend only having a 'crushing & screening unit' and no separate units |
|
| 3 |
MNQOPS321A |
Conduct crushing and screening plant operations |
|
|
|
|
|
|
|
| 2 |
MNQOPS225A |
Operate programmable logic control systems |
|
|
|
|
|
|
|
|
|
| 2 |
MNMPPD206A |
Bulk package and store product |
|
|
|
|
|
|
|
|
|
| 2 |
MNQOPS222A |
Conduct blending plant operations |
RIIPRO205 |
Conduct blending plant operations |
|
| 2 |
PMCOPS202C |
Operate equipment to blend/mix materials |
Note: |
Metalliferous NSW recommend comparison with 4.3.4 units |
|
|
|
|
|
|
|
| 2 |
MNQOPS223A |
Conduct sand wash plant operations |
Note: |
CMPA recommend recoding as '300' unit |
|
|
|
|
|
|
|
| 3 |
MNMPGP309A |
Perform process control room operations |
RIIPRO302 |
Perform processing control room operations |
|
| 3 |
MNQOPS325A |
Operate centralised process control systems |
|
| 3 |
MNCP1003A |
Control coal preparation plant operations |
|
|
|
|
|
|
|
| 4 |
MNQOPS420A |
Supervise processing operations |
RIIPRO401 |
Supervise processing operations |
|
| 4 |
MNCO1118A |
Supervise coal processing operations |
|
| 4 |
PMAOPS411A |
Manage plant shutdown and restart |
|
|
|
|
|
|
|
| 4 |
MNQOPS426A |
Supervise recycled materials operations |
Note: |
CMPA recommend separate unit for recycling, not just processing |
|
|
|
|
|
|
|
| 5 |
MNQOPS520A |
Implement site processing plant operations |
RIIOPS501 |
Implement site processing plant operations |
|
| 5 |
MNMMMG509A |
Develop, implement and maintain process control systems |
|
|
|
|
|
|
|
| 6 |
MNQOPS604A |
Design processing plant |
|
|
|
| |
|
|
|
|
|
| 3.5 Plant & Equipment Operations - RIIPEO |
|
|
|
|
|
|
|
|
|
| 2 |
MNCO1028A |
Conduct conveyor operations |
RIIPEO201 |
Conduct conveyor operations |
|
| 2 |
MNMG228A |
Conduct conveyor operations |
|
|
|
|
|
|
|
| 2 |
MNMULH204A |
Conduct skip operations |
|
|
|
|
|
|
|
|
|
| 2 |
MNMG243A |
Conduct stacker operations |
|
|
|
|
|
|
|
|
|
| 2 |
MNMG245A |
Conduct shore side mooring operations |
|
|
|
|
|
|
|
|
|
| 2 |
MNMG241A |
Conduct ship loading operations |
|
|
|
|
|
|
|
|
|
| 2 |
MNCO1025A |
Lay and recover cables and hoses |
|
|
|
|
|
|
|
|
|
| 4 |
MNCO1031A |
Coordinate conveyor system shift |
|
|
|
|
|
|
|
|
|
| 3.6 Conservation & Rehabilitation - RIICAR |
|
|
|
|
|
|
|
|
|
| 2 |
RTD2022A |
Carry out natural area restoration works |
|
|
|
|
|
|
|
|
|
| 2 |
RTD2202A |
Conduct erosion and sediment control activities |
|
|
|
|
|
|
|
|
|
| 3 |
RTD3034A |
Implement revegetation works |
|
|
|
|
|
|
|
|
|
| 3 |
RTD3205A |
Construct conservation earthworks |
|
|
|
|
|
|
|
|
|
| 2 |
THTGTM02A |
Carry out grounds maintenance |
|
|
|
|
|
|
|
|
|
| 3 |
MNMEGS314A |
Rehabilitate exploration site |
|
|
|
|
|
|
|
|
|
| 3 |
MNMSM304A |
Rehabilitate small mine site |
|
|
|
|
|
|
|
|
|
| 4 |
MNQOPS405A |
Supervise rehabilitation operations |
|
|
|
|
|
|
|
|
|
| 3.7 Water Management - RIIWMG |
|
|
|
|
|
|
|
|
|
| 2 |
BCCCM2004B |
Drain and dewater site |
RIIWMG201 |
Undertake dewatering activities |
|
| 2 |
MNCO1026A |
Conduct dewatering operations |
|
| 2 |
MNQOPS202A |
Conduct dewatering operations |
|
| 2 |
MNCU1062A |
Dewater roadways and work areas |
|
| 2 |
MNMUMS210A |
Undertake dewatering |
|
|
|
|
|
|
|
| 2 |
MNMPBP204A |
Reclaim and treat water system |
Note: Coal and Metalliferous requested a separate unit to cover this |
|
|
|
|
|
|
|
| 3 |
BCCCM3002B |
Control construction site water table |
|
|
|
|
|
|
|
|
|
| 4 |
MNQOPS402A |
Apply site water management plan |
RIIWMG401 |
Apply and monitor the site water management plan |
|
| 4 |
MNCO1107A |
Apply and monitor the site water management plan |
|
|
|
|
|
|
|
| 4 |
MNMPBP403A |
Monitor, coordinate and operate waste water treatment processes |
|
|
|
|
|
|
|
|
|
| 5 |
MNCO1106A |
Implement the site water management plan |
RIIWMG501 |
Implement the site water management plan |
|
| 5 |
|